You need an inspection plan to capture the results of quality records.
To define inspection methodology, you have to enter the following details −
In the inspection plan, you have to define the sequence of inspection steps to be performed and the range of specifications as per the Master Inspection Characteristics, sampling procedure to calculate the sample size for inspection, inspection method, etc.
You can define the status of Inspection plan as Active/ Inactive and usage of the plan.
Step 1 − To create Inspection plan, use T-Code: QP01.
Step 2 − In the next screen, enter the following details −
Step 3 − In the next screen, enter the following details −
Enter the input usage as 5, which means inspection plan will be valid for goods received and status as 4, which means the plan is released.
Select the lot size as 99999999 that allows an inspection plan to be valid for inspection lot quantity of 99999999.
Press the Operations button at the top to move to the next screen.
Step 4 − In the next screen, enter the following details −
Step 5 − In the next window, enter the following details −
Click the save button to save Inspection plan.